Metallic Constructions
Oran Airport
2018
Oran,Algeria

Infrastructures
Oran Airport
Client
Cosider Construct
Project Owner
EGSA
Area
16,000 sqm
Weight
1,200 t.
Intervention
Martifer Metallic Constructions is responsible for the fabrication and erection of 1,200 tonnes of steel structure and 16,000 sqm of Skinzip cladding on the roof. The works also include the supply and installation of a rooftop photovoltaic system comprising 5,500 photovoltaic panels.
Share project on


