Metallic Constructions
Estoril Sol Residence
2009
Cascais,Portugal

Residential and hotels
Estoril Sol Residence
Client
ACE - Somague and Edifer
Project Owner
Fundor – Fundo de Investimento Imobiliário
Architecture
Gonçalo Byrne Arquitectos
Weight
900 t.
Intervention
Martifer Metallic Constructions is responsible for the steel structure. This project stands out for its assembly methodology. The three cantilever structures were pre-assembled on the ground and then erected using three 120-tonne hoists.
Share project on



Go Up