Metallic Constructions
Arena Castelão Stadium
2012
Fortaleza,Brazil
Sports and culture
Arena Castelão Stadium
Client
Consórcio Castelão
Weght
2.200 t
Area
34 000 sqm of roof cladding (of which 28 000 sqm of Deck system with isolation and 6 000 sqm of transparent corrugated polycarbonate)
Scope
Fabrication, transportation and assembly of the roof structural steelwork, installation of the roof.
Share project on
Go Up