Metallic Constructions
Abi Bakr bridge
2017
Riyadh,Saudi Arabia
Infrastructures
Abi Bakr bridge
Owner
ADA – Arriyadh Development Authority
Client
YUKSEL
Weight
3.500 t
Scope
Supply, fabrication, painting, transportation and assembly of the structural steelwork for the Abi Bakr bridge with 10 meters height, 300 meters long and 7 spans.
Share project on
projects
Metallic Constructions
Torre 30
Go Up