Metallic Constructions

Abi Bakr bridge

2017
Riyadh,Saudi Arabia
Martifer Group
Infrastructures

Abi Bakr bridge

Owner
ADA – Arriyadh Development Authority
Client
YUKSEL
Weight
3.500 t
Scope

Supply, fabrication, painting, transportation and assembly of the structural steelwork for the Abi Bakr bridge with 10 meters height, 300 meters long and 7 spans.

Share project on
Martifer Group
Go Up
Trust Us